Refurbishment & Cat B Fit Out for Griffin House in London

Griffin House Celltarga won the tender to refurbish this 2nd floor office space, totalling 10,000 sq.ft.

We were required to install a reception area, variety of new conference rooms, small meeting rooms including a glazed cellular room, a new kitchen with a hot water Zip Tap removing the need for a kettle, sockets and appliance cables.

Included was a café allowing 20% of the staff to sit down in one sitting, with images of Westminster, ceiling height storage cabinets and an open plan work area for 150+ work stations.

  • Scope of works included:

  • Partitioning and associated door sets

  • Floor finishes

  • Cafe, Kitchen, Tea Point, Copy Point, IT Store and associated joinery

  • Installation of new metal tile ceilings

  • External window blinds

  • Floor to ceiling storage cabinets

  • Supply and fit balustrade handrail

  • Installation of A/V and IT/Data

  • Signage and manifestations

  • Mechanical and electrical works - VRV air-conditioning

There was strict control of site access with additional restrictions in place for noise related works above 80dB during office hours, due to the close proximity of adjacent offices and local residents. We completed this 8 week project on time and on budget (£300K).