Caxton Hub This project involved converting a basement vault from when the building was a bank and refurbishing this floor and the one above in just 14 weeks.

  • Scope of works included:

  • Specialist demolition to remove walls and keep noise to a minimum as the building was occupied during works.

  • Strip out both floors

  • Timber and glass partitioned offices and meeting rooms

  • Mechanical and electrical

  • IT and data

  • Break out area with cafe and library