Alter & Refit for The Aldridge Academy in Brighton

The Brighton Aldridge Academy The nature of this project was to better utilise the space as a wing of the college was to be used as a nursery. The rooms needed to be re-organised and altered, which included the central atrium which was configured to BREAAM Excellent Standard over the school summer holidays.

  • Scope of works included:

  • Mechanical and electrical work

  • Dry wall partitioning and associated door sets

  • Floor finishes

  • Tiling

  • Supply and fit new W/C compartments and washroom FF&E

  • Joinery

  • Glazing wall mounted door height vision panels

  • Fibre ceiling tiles and void net in atrium

  • Supply and install audio/visual equipment including white boards

  • Plastering & decorate throughout

  • Installations of security systems